Nine days ago, on January 1, 2026, the 2025 California Building Standards Code (Title 24) became mandatory for all permit applications. While much attention focuses on energy efficiency, this guide reveals the complete code update: a new standalone Wildland-Urban Interface Code consolidating fire-resistant construction requirements, mandatory Level 2 EV chargers replacing 'EV-capable' rough-in, and formal 65% waste diversion plans. With AB 130's six-year code freeze through 2031, mastering these requirements now is critical for long-term business success in Pacific Beach coastal construction.

Understanding the Complete 2025 Building Standards Code: Beyond Energy Requirements

The 2025 California Building Standards Code was published July 1, 2025, and became effective January 1, 2026, for all permit applications submitted on or after that date. Based on the International Building Code 2024 with California-specific amendments, Title 24 comprises 12 distinct parts, each addressing different aspects of construction:

  • Part 2: Building Code (structural, fire, life safety)
  • Part 3: Electrical Code
  • Part 5: Plumbing Code
  • Part 6: Energy Code (the focus of most media coverage)
  • Part 7: Wildland-Urban Interface Code (NEW standalone code)
  • Part 9: Fire Code
  • Part 11: CALGreen (green building standards)

While Title 24 Part 6 energy requirements have received extensive coverage, builders must understand that successful permit approval and inspection requires compliance with ALL applicable parts simultaneously. A project might achieve perfect energy compliance while failing structural, waste management, or EV infrastructure requirements. For home remodeling projects, understanding these comprehensive requirements is essential for project success.

The City of San Diego Development Services confirms that local amendments are being processed and are expected to be in effect in March or April 2026. Until those local amendments are adopted, the state code applies in full. For coastal Pacific Beach properties, this means coordinating Title 24 requirements with Coastal Development Permit requirements, which remain mandatory for all coastal development within the Coastal Overlay Zone.

NEW Wildland-Urban Interface Code (Part 7): Which Pacific Beach Properties Are Affected?

Perhaps the most significant structural change in the 2025 code cycle is the creation of a standalone California Wildland-Urban Interface Code (CWUIC), codified as Title 24, Part 7. Previously, wildfire-resistant construction standards were dispersed across the California Building Code (Part 2, Chapter 7A), the California Residential Code (Part 2.5, Section R337), and portions of the California Fire Code (Part 9). These provisions have now been consolidated, reorganized, and significantly strengthened into a single enforceable code based on the International Wildland-Urban Interface Code (IWUIC).

Fire Hazard Severity Zone Determination

The WUI Code applies to properties within Fire Hazard Severity Zones (FHSZ) designated by CAL FIRE in State Responsibility Areas (SRA) and Local Responsibility Areas (LRA) designated as Very High Fire Hazard Severity Zones. State law requires CAL FIRE to designate areas at risk from significant fire hazards based on fuels, terrain, weather, and other relevant factors.

For Pacific Beach builders, the critical question is: does the Wildland-Urban Interface Code apply to coastal properties?

The answer is nuanced and property-specific. While many coastal areas in San Diego County are now considered fire zones, marking a significant shift from previous assessments, the specific designation depends on proximity to open space and vegetation. State Fire Marshal Daniel Berlant emphasized that even residents who don't perceive a fire hazard should be aware that open land a mile away could send wind-carried embers into more urbanized neighborhoods.

Canyon properties are at particular risk. Zone Zero regulations are likely to be particularly impactful in San Diego because the city has so many homes that back up to canyons, with the Fire Department stressing the need to clear a minimum of 30 feet of brush from all structures on canyon rims or in fire-prone areas.

Action Item: Check the official City of San Diego Fire Hazard Severity Zone Map for your specific project location. Properties in designated zones must comply with WUI Code requirements for:

  • Ignition-resistant exterior walls
  • Class A roofing assemblies
  • Ember-resistant vents (maximum 1/8-inch openings)
  • Protected eaves, soffits, and canopies
  • Deck and attachment construction standards
  • Accessory structures (sheds, detached garages, and ADUs)

For coastal properties adjacent to Rose Canyon, Kate Sessions Park, or other open space areas, WUI compliance may be required even though the property is near the ocean. Beachfront properties without vegetation exposure typically do not fall under WUI requirements, but builders should verify designation during the pre-application conference.

WUI Construction Cost Impacts

The new WUI Code requirements demand new expertise and materials, with details and specifications for vents, siding, and structural connections needing to meet the enhanced standard. While comprehensive cost data for the 2025 requirements is still emerging, builders should budget for:

  • Premium roofing materials meeting Class A fire rating
  • Specialized ember-resistant vents (approximately $50-$150 per vent vs. $10-$30 for standard vents)
  • Fire-resistant siding materials or additional protective assemblies
  • Enhanced deck construction with ignition-resistant materials
  • Increased labor costs for specialized installation techniques

Mandatory Level 2 EV Charger Installation: The End of "EV-Capable" Rough-In

The 2025 California Building Code represents a fundamental shift in electric vehicle infrastructure requirements. Previous code cycles required "EV-capable" spaces—essentially electrical rough-in with conduit and panel capacity for future charger installation. The 2025 code eliminates this halfway approach and mandates actual installed Level 2 EV chargers with minimum 30-ampere output capacity.

Single-Family and Townhouse Requirements

For new one- and two-unit single-family dwellings or townhouses with attached private garages, the code requires installation of a listed raceway to accommodate a dedicated 208/240-volt branch circuit, with the raceway not less than trade size 1 (nominal 1-inch inside diameter). More significantly, a low-power Level 2 EV charging receptacle must be installed at an accessible location within the garage.

This represents a clear departure from previous "EV-ready" language. Builders must now:

  1. Install dedicated 240-volt circuit with appropriate amperage (typically 40-50 amps)
  2. Size circuit breakers at 125% of continuous load per NEC requirements
  3. Install actual Level 2 charging receptacle or hardwired EVSE (Electric Vehicle Supply Equipment)
  4. Ensure electrical panel has sufficient capacity for the additional load
  5. Document EV charger installation on electrical plans and permits

Multifamily Building Requirements

The 2025 code represents a major expansion for multifamily properties. According to the detailed CALGreen summary:

Assigned Parking: Where dwelling units are provided with assigned parking spaces equal to or greater than the number of dwelling units, at least one low-power Level 2 EV charging receptacle shall be provided at an assigned parking space for each dwelling unit.

Unassigned/Common Parking: Twenty-five percent (25%) of unassigned or common-use parking spaces not already provided with low-power Level 2 EV charging receptacles shall be equipped with Level 2 EV chargers and made available for use by all residents or guests.

These changes effectively make 100% of new multifamily units EV-ready—a major leap from the 2022 code that required only 40% coverage.

Electrical Panel Sizing and Load Calculations

The mandatory EV charger requirements create significant electrical infrastructure challenges. Level 2 chargers require 240-volt circuits ranging from 32 to 80 amps depending on the charger capacity:

  • 32A charger: Requires 40A breaker and appropriate wire gauge
  • 40A charger: Requires 50A breaker
  • 48A charger: Requires 60A breaker
  • 80A charger: Requires 100A breaker

Per NEC regulations, circuit sizing must follow the 125% continuous-load rule: breakers and conductors must be rated at 125% of the EVSE nameplate current. For a 40-amp charger, the circuit must be rated for 50 amps.

For single-family homes, most 100-amp or 200-amp electrical panels can accommodate one Level 2 charger with proper load calculations. However, multifamily buildings face significant infrastructure challenges, with utility service to sites likely to double in size and costs for larger transformers, conduit, cabling, service boards, and site distribution wiring becoming substantial.

EV Charger Cost Impact Analysis

According to industry analysis, EV chargers range from $2,500 to $5,000 each, and the total cost is likely to drive per-unit housing costs up by $10,000 or more for multifamily projects. This doesn't include long-term operation and maintenance costs.

For Pacific Beach single-family projects, budget expectations should include:

  • Level 2 EVSE hardware: $600-$1,500 (basic models) to $2,000-$3,000 (smart/networked models)
  • Electrical installation: $500-$1,500 depending on distance from panel
  • Panel upgrades if needed: $2,000-$4,000 for service upgrade from 100A to 200A
  • Permit fees: Included in overall electrical permit

Multifamily projects face exponentially higher costs, particularly for buildings with shared parking requiring receptacles at every single spot. Capital costs and long-term operational costs may result in the cancellation of potential new multifamily projects in some markets.

65% Construction Waste Diversion: Formal Waste Management Plans Now Required

The California Green Building Standards Code (CALGreen, Title 24 Part 11) has long required construction waste diversion, but the 2025 code strengthens documentation and enforcement requirements. CALGreen Code Section 5.408.1 requires recycling and/or salvaging for reuse a minimum of 65 percent of the non-hazardous construction and demolition waste, or meeting a local construction and demolition waste management ordinance, whichever is more stringent.

Waste Management Plan Requirements

The California Green Building Standards Code instructs local jurisdictions to require contractors to develop and maintain a waste management plan to verify a minimum 65 percent waste diversion. This is not optional—it's a mandatory code requirement.

The waste management plan must:

  1. Identify materials to be diverted: Document all construction and demolition waste materials to be diverted from disposal through efficient usage, recycling, reuse on the project, or salvage for future use or sale
  2. Specify sorting methodology: Indicate whether materials will be sorted on-site (source separated) or bulk mixed (single stream)
  3. Remain accessible: Be available during construction for examination by the enforcing agency
  4. Be updated as necessary: Reflect actual project conditions and waste streams

Documentation and Compliance Verification

Documentation must be provided to the enforcing agency demonstrating compliance with waste management requirements. The inspector may request:

  • Haul tags: Documentation from waste haulers showing material weights and destinations
  • Facility reports: Verification from waste management companies or recycling facilities confirming receipt and processing of diverted materials
  • Calculation worksheets: Demonstrating that diverted materials reach the 65% threshold by weight

The waste management plan must be submitted early in the permit process, and final compliance reporting must be completed within 90 days after construction completion for the project, along with signed-off final permit.

Practical Implementation for Pacific Beach Projects

For typical residential construction or remodeling projects in Pacific Beach, achieving 65% diversion requires strategic planning:

High-Diversion Materials (prioritize for recycling/reuse):

  • Wood framing and dimensional lumber
  • Concrete and masonry
  • Metals (steel, aluminum, copper)
  • Asphalt and roofing materials
  • Drywall/gypsum board
  • Cardboard and packaging

Best Practices:

  1. Identify qualified recycling facilities before project start
  2. Designate on-site sorting areas if space permits
  3. Train crews on separation requirements
  4. Track waste streams throughout construction
  5. Maintain hauler receipts and facility documentation
  6. Calculate diversion percentage before submitting final report

For Pacific Beach projects, local waste management providers familiar with construction debris recycling can provide guidance on achievable diversion rates and acceptable facilities.

AB 130 Code Freeze Through 2031: Strategic Implications for Pacific Beach Builders

On June 30, 2025, Governor Gavin Newsom signed AB 130 into law as part of groundbreaking housing affordability reforms. The bill prevents the state of California from considering, approving, or adopting any changes to residential building codes until June 1, 2031, except in emergency situations or for wildfire mitigation.

This represents a historic departure from California's typical three-year code cycle. There will be no Residential 2028 Code Cycle or any intervening code updates until the 2031 Code Cycle, at which point a new code may be considered. The freeze imposes a near-complete moratorium on local modifications to building standards affecting residential units from October 1, 2025, through June 1, 2031.

What the Freeze Means for Builders

The six-year code freeze creates unprecedented stability and predictability:

Advantages:

  • Long-term planning certainty: Design standards established now remain valid through 2031
  • Training investment: Staff training on 2025 code requirements has extended value
  • Template development: Permit sets, details, and specifications can be refined and reused
  • Cost predictability: No surprise mid-cycle requirements affecting project budgets

Considerations:

  • Technology evolution: Building technology will continue advancing while code remains static
  • Market pressure: Buyers may expect features (smart home integration, advanced HVAC) beyond code minimums
  • Competitive differentiation: Code compliance becomes table stakes; value comes from exceeding requirements

Strategic Business Planning

For Pacific Beach builders, the six-year freeze creates opportunities for strategic positioning:

  1. Deep expertise development: Invest in comprehensive understanding of ALL Title 24 parts, not just energy code
  2. Process optimization: Develop streamlined workflows for waste management documentation, EV infrastructure coordination, and WUI compliance where applicable
  3. Client education: Position as the expert who understands the complete regulatory landscape through 2031
  4. Voluntary excellence: Consider voluntary CALGreen Tier 1 or Tier 2 provisions to differentiate from code-minimum competitors

Cost Impact Analysis: Budgeting for Multi-Part Code Compliance

The 2025 Building Standards Code changes create cumulative cost impacts that builders must factor into project budgets. While energy code changes receive most attention, the complete compliance picture includes multiple cost centers.

Itemized Cost Impacts for Typical Pacific Beach Single-Family Home

WUI Code Compliance (if property in designated zone):

  • Class A roofing materials: $2,000-$5,000 premium over standard roofing
  • Ember-resistant vents: $1,000-$2,500 (20-30 vents at $50-$150 each vs. $10-$30 standard)
  • Fire-resistant siding/assemblies: $3,000-$8,000 depending on materials
  • Enhanced deck construction: $2,000-$4,000 for ignition-resistant materials
  • Subtotal WUI: $8,000-$19,500 (properties in fire zones only)

Level 2 EV Charger:

  • EVSE hardware: $600-$3,000
  • Installation: $500-$1,500
  • Panel upgrade (if needed): $2,000-$4,000
  • Subtotal EV: $1,100-$8,500

Waste Management Compliance:

  • Plan preparation: $500-$1,000
  • On-site sorting infrastructure: $500-$1,500
  • Recycling facility fees premium: $1,000-$2,500
  • Documentation and reporting: $300-$800
  • Subtotal Waste: $2,300-$5,800

Energy Code Compliance (covered in separate article):

  • Heat pump HVAC upgrades: $8,000-$15,000
  • Air barrier and sealing: $2,000-$5,000
  • HRV/ERV systems: $3,000-$8,000
  • Heat pump water heater: $2,000-$4,000
  • Subtotal Energy: $15,000-$32,000

CALGreen Additional Requirements:

  • MERV 13 filtration: $500-$1,200
  • Water-efficient fixtures: $800-$2,000
  • Low-emission materials premium: $1,000-$3,000
  • Subtotal CALGreen: $2,300-$6,200

Total 2025 Code Compliance Cost Impact: $20,700-$52,500 for non-WUI properties; $28,700-$72,000 for properties in WUI zones.

For a typical 2,000-square-foot Pacific Beach custom home with construction costs of $600,000-$800,000, code compliance represents approximately 3.5%-9% of total project cost.

Coastal Construction Considerations: Salt Air Corrosion and Marine Environment

Pacific Beach's coastal location creates unique challenges beyond Title 24 code minimums. While not explicitly addressed in state building code, understanding coastal corrosion and durability is essential for long-term building performance. Coastal construction projects in Pacific Beach face unique material requirements and cost premiums.

Corrosion Challenges

Metal corrosion is most pronounced on coastal homes within 3,000 feet of the ocean. Research shows the highest coastal corrosion rates are generally within 400 to 600 meters (1,300 to 2,000 feet) of the shoreline, and they begin to rise exponentially within the closest 50 to 200 meters (165 to 650 feet).

Salt water is an excellent electrolyte contributing to an aggressive corrosive environment. Hydrostatic forces, wind, salt spray, currents, tides, waves, and ice all contribute to corrosion and erosion of waterfront systems and structures. Environmental Severity Classification (ESC) for waterfront areas is typically C5 (Very High Corrosivity).

Recommended Materials for Coastal Pacific Beach

Metals:

  • Stainless steel: 316 or 316L (low carbon) stainless steel composed of 2% to 3% molybdenum, boosting corrosion resistance—the most commonly used for coastal applications
  • Aluminum: Aluminum, stainless steel, and copper are preferred for coastal environments due to corrosion resistance
  • Galvanized steel: If steel must be used, minimum G90 galvanized with quality paint finish, though corrosion studies show less than three years before red rust in worst environments

Other Materials:

  • Concrete: When properly treated and sealed, maintains integrity over time even with relentless salt spray
  • Fiber cement siding: Resilience against salt spray makes it ideal for coastal construction
  • uPVC materials: Resistant to corrosion caused by salt-laden air

Conclusion: Comprehensive Expertise for Long-Term Success

The 2025 California Building Standards Code, effective January 1, 2026, represents the most comprehensive update to construction requirements in years—and with AB 130's freeze through 2031, these requirements will shape the industry for the next six years. While energy efficiency changes capture headlines, the complete compliance picture encompasses structural, electrical, fire safety, and sustainability requirements that every Pacific Beach builder must master.

The new standalone Wildland-Urban Interface Code consolidates fire-resistant construction requirements that may apply to canyon-adjacent properties even in coastal areas. Mandatory Level 2 EV charger installation replaces the previous "EV-capable" approach, requiring actual installed infrastructure with significant electrical panel and cost implications. The 65% construction waste diversion mandate demands formal waste management planning, documentation, and enforcement.

For Pacific Beach builders working in the coastal zone, these state requirements layer onto existing Coastal Development Permit processes, creating a complex regulatory environment that demands comprehensive expertise. Add in coastal-specific challenges—salt air corrosion, wind exposure, proximity to flood zones, and material durability requirements—and the knowledge gap between code-minimum compliance and true construction excellence becomes clear. Understanding fire safety requirements for ADUs is also critical when adding accessory structures to coastal properties.

The six-year code freeze creates unprecedented opportunity for builders who invest in deep, comprehensive understanding of the complete Title 24 framework. Rather than chasing evolving requirements every three years, you can develop refined processes, train teams thoroughly, and position yourself as the definitive expert on building code compliance through 2031.

At Pacific Beach Builder, we understand that comprehensive regulatory expertise is just the foundation. Our coastal construction experience, commitment to quality, and systematic approach to code compliance across ALL disciplines—structural, electrical, fire, energy, and sustainability—ensures your project moves smoothly from permit to final inspection. Whether you're building a new custom home, adding an ADU, or planning a major remodel, we provide the expertise that transforms complex code requirements into successful, high-performance projects.

The 2025 Building Standards Code is now in effect. San Diego's local amendments arrive in March or April 2026. The time to ensure your team, processes, and projects align with the new requirements is now.

Frequently Asked Questions

Does the California Wildland-Urban Interface Code apply to beachfront properties in Pacific Beach?

It depends on the property's specific Fire Hazard Severity Zone designation. While beachfront properties without vegetation exposure typically do not fall under WUI requirements, properties adjacent to canyons (like Rose Canyon) or open space areas may be designated as fire zones even though they're near the ocean. Check the official City of San Diego Fire Hazard Severity Zone Map for your specific location. CAL FIRE's updated 2025 maps significantly expanded designated areas, particularly neighborhoods adjacent to open space that were not previously identified as high hazard. Canyon-rim properties are at particular risk and likely subject to WUI Code requirements including ember-resistant vents, Class A roofing, and ignition-resistant construction.

What's the difference between the old "EV-capable" requirement and the new mandatory Level 2 charger installation?

Previous code cycles required "EV-capable" parking spaces, which meant installing electrical conduit and ensuring panel capacity for future charger installation—but no actual charger. The 2025 code eliminates this halfway approach and mandates installed Level 2 EV chargers with minimum 30-ampere output capacity. For single-family homes, this means a functional charging receptacle or hardwired EVSE must be installed in the garage at time of construction. The circuit must be properly sized (typically 40-50 amps for a 32-40 amp charger), the electrical panel must have sufficient capacity, and the installation must be documented on electrical permits. This represents a significant shift from planning for future EV infrastructure to providing it immediately.

How do I prove 65% waste diversion compliance to pass final inspection?

You must develop a formal waste management plan early in the permit process, identifying materials to be diverted and specifying whether you'll use on-site sorting or single-stream recycling. Throughout construction, maintain all hauler receipts showing material weights and destinations. Obtain documentation from waste management companies or recycling facilities confirming receipt and processing of diverted materials. Calculate total waste generated versus materials diverted by weight to demonstrate 65% diversion. Submit a final compliance report within 90 days after construction completion, including all documentation. Many jurisdictions require security deposits that are forfeited if you don't meet the 65% threshold, so track diversion percentage throughout the project—not just at the end. Working with qualified recycling facilities and training crews on proper separation makes achieving 65% diversion straightforward for most residential projects.

When will San Diego's local amendments to the 2025 Building Code be adopted?

The City of San Diego Development Services confirms that local amendments are being processed and are expected to be in effect in March or April 2026. Until local amendments are adopted, projects submitted after January 1, 2026, must comply with the state code in full. Local amendments typically address enforcement procedures, inspection protocols, and coordination with local conditions but rarely conflict with state requirements. For Pacific Beach coastal zone properties, local amendments may clarify coordination between Title 24 requirements and Coastal Development Permit processes. Check with Development Services before permit submittal to confirm whether local amendments have been adopted and if any specific provisions affect your project.

Does my existing 100-amp electrical panel have enough capacity for a mandatory Level 2 EV charger?

It depends on your total electrical load. A proper load calculation by a licensed electrician is essential. The calculation must account for general lighting and receptacles (square footage-based), kitchen appliances, HVAC equipment (increasingly heat pumps per energy code), water heating (often heat pump water heaters per energy code), the EV charger continuous load at 125%, laundry equipment, and any specialty loads. For smaller homes with gas appliances, a 100-amp panel may be sufficient. However, if your home is all-electric or has significant electrical loads, you may need to upgrade to 200-amp service ($2,000-$4,000 typically). The 2025 energy code's heat pump requirements for HVAC and water heating increase electrical loads substantially, making 200-amp service the safer choice for most new construction. Your electrician can determine the proper service size during design.

How much will the 2025 Building Code changes add to my Pacific Beach custom home construction cost?

For a typical 2,000-square-foot custom home, comprehensive code compliance costs range from approximately $20,700-$52,500 for non-WUI properties, or $28,700-$72,000 for properties in designated fire zones. This includes Level 2 EV charger installation ($1,100-$8,500), waste management compliance ($2,300-$5,800), energy code requirements like heat pumps and HRV systems ($15,000-$32,000), CALGreen indoor air quality and water efficiency ($2,300-$6,200), and WUI Code fire-resistant construction if applicable ($8,000-$19,500). On a $600,000-$800,000 construction budget, this represents approximately 3.5%-9% of total project cost. However, these requirements often provide long-term value through energy savings, EV charging convenience, fire protection, and healthier indoor environments. Coastal properties may have additional costs for corrosion-resistant materials beyond code minimums to ensure long-term durability in the salt air environment.

What happens if I submit permit applications before January 1, 2026, but start construction after that date?

The applicable code is determined by permit application submission date, not construction start date. Permits submitted before January 1, 2026, are governed by the 2022 Building Standards Code. Permits submitted on or after January 1, 2026, must comply with the 2025 code. However, if you're in the design phase for a project that will be submitted in early 2026, plan for 2025 code compliance to avoid last-minute redesign. Once you receive a permit under a specific code edition, that edition governs through construction—even if code updates occur during construction. This provides important stability for projects with extended timelines.

Are there any exemptions to the 65% construction waste diversion requirement?

The CALGreen requirement applies to virtually all new construction and major renovations. However, some materials are excluded from the calculation: hazardous wastes, land-clearing debris, and materials with no viable recycling markets in your area may be exempted by the local jurisdiction. The requirement is to "recycle and/or salvage for reuse a minimum of 65 percent of the non-hazardous construction and demolition waste, or meet a local construction and demolition waste management ordinance, whichever is more stringent." Some cities have local ordinances with higher thresholds (70%+) or different requirements. The key is that virtually all standard construction waste streams—wood, concrete, metal, drywall, cardboard, asphalt—must be diverted through recycling or reuse. Achieving 65% is straightforward with proper planning and qualified recycling facilities.

How does the AB 130 six-year code freeze affect my long-term construction business planning?

The AB 130 freeze through June 1, 2031, creates unprecedented stability. There will be no Residential 2028 Code Cycle or intervening updates, meaning the 2025 requirements remain in effect for six years instead of the typical three. This provides significant advantages: design standards and details developed now remain valid through 2031; staff training on 2025 code requirements has extended value; permit sets can be refined and reused across multiple projects; and cost estimating has long-term predictability without surprise mid-cycle changes. However, building technology will continue advancing while code remains static, so buyers may expect features beyond code minimums. The freeze creates opportunity for builders who invest in deep expertise on the complete Title 24 framework, positioning themselves as the definitive code compliance experts through 2031. Non-residential buildings are not subject to the freeze, so commercial projects may see continued local reach code development.

Do I need special building materials for coastal Pacific Beach construction beyond code requirements?

While Title 24 doesn't explicitly address coastal corrosion, salt air creates aggressive corrosive conditions that demand materials beyond code minimums for long-term durability. Metal corrosion is most pronounced within 3,000 feet of the ocean, with exponentially higher rates within 165-650 feet. Use 316 or 316L stainless steel (2-3% molybdenum) for coastal applications rather than standard stainless. Specify minimum G90 galvanized fasteners with quality paint finish, though even these show red rust in under three years in worst exposures. Fiber cement siding resists salt spray better than wood or standard composite materials. Use galvanized or epoxy-coated reinforcing steel in concrete. Avoid joining dissimilar metals with high galvanic potential. All coastal buildings require more maintenance than inland structures, but proper material selection dramatically extends service life and reduces repair costs. Environmental Severity Classification for Pacific Beach waterfront areas is typically C5 (Very High Corrosivity), which should guide all material selection decisions.

This article provides general information about the 2025 California Building Standards Code for educational purposes. Building code requirements can be complex and site-specific. Always consult with qualified professionals—architects, engineers, and licensed contractors—and verify current requirements with the City of San Diego Development Services before beginning any construction project. Code interpretations and local amendments may affect specific project requirements.